• Language
    • हिन्दी
    • English
  • CBRI Mail
  • CBRI Intranet
  • Sitemap
  • Gallery
    • Photographs
    • Videos
    • Societal Activities
      • Abhivyakti
      • Shanti nagar Ladies Club
Top Menu


  

BloggerInstagramPinterestTumblrLinkedinFlickrYouTubeGoogle+TwitterFacebook
CSIR - CBRI, RoorkeeCSIR - CBRI, Roorkee
CSIR – CBRI, Roorkee
Central Building Research Institute
  • Home
  • The Institute
    • About Institute
    • Organogram
    • Director’s Profile
    • Research Council
    • Management Council
    • Our Navigators
    • Manpower
    • Performance Indicators
      • Patents
      • Publication
      • Technologies
      • Financial Cash Flow
      • External Cash Flow
      • Memorandum of Understanding
  • R&D
    • R&D Areas
    • R&D Groups
    • R&D Support Activities
    • R&D Programs
      • Supra Institutional Network Project
      • Network Project
      • In-House
      • Ext. Lab Co-Ordinated
    • R&D Services
      • Grant-In-Aid Projects
      • Sponsored Research
      • Developmental Projects
  • AcSIR
    • MTech
    • PhD
    • AcSIR (HQ)
  • KRC
    • General Information
    • Collections
    • Facilities to Services
    • E – Database
    • E – Journals
    • CBRI IR
  • Dissimination
    • Annual Reports
    • News Letters
    • BRNCS
    • Training Course
    • Workshop/Seminars/Conference
    • Colloquiums
  • Notifications
    • Tenders
    • Recruitments
  • Scientists’ Profiles
  • Staff
    • Group IV
    • Group III
    • Group II & I
    • Administration
  • Contacts
Menu back  
 

ENGINEERING OF DISASTER MITIGATION AND HEALTH MONITORING FOR SAFE AND SMART BUILT ENVIRONMENT

NETWORK PROJECT Under CSIR-12TH FIVE YEAR PLAN

Task – 6.8: Communication Network architecture for intelligent buildings

Task Leader:-  Kota Solomon Raju

Objective:
  1. Design and development of a communication, safety & security system with RTOS support for Intelligent   Buildings. It includes Design of FPGA and /or ARM processor based communication system for the   entire building using wireless technology. WSN System with sister labs developed sensors and commercial sensors for minimum twenty flats in the apartment building. (i.e. combination of sister labs   sensors and commercial sensors from CGCRI, Kolkata, CSIO Chandigarh and CMERI Durgapur).
  2. Development of Sensor placement optimization (optimization parameters are Energy and data communication latency) algorithm.
  3. Design and implementation of the end-device zigbee motes with desired sensor attachment.
  4. PCB designed prototype system for end device using ARM processor /microcontroller as main component.
Scope of Work:
  1. Exploration & Planning of various Hybrid Network Architectures
  2. Development of Sensor placement optimization algorithm
  3. Design & implementation of End-device Zigbee Motes with desired sensor attached to it
  4. Integration of Zigbee Sensor Motes with identified Topology
  5. Design & Implementation of Centralized Network Monitoring System with capability of integrating other subsystems
  6. Design & Implementation of ARM based Centralized Network Monitoring System
  7. Design & Implementation of ARM based Centralized Network Monitoring System with RTOS support
  8. Design & Implementation of High performance FPGA based Centralized Security System with Biometric identification system at the main building
  9. Integration of all other subsystems to the above system at the main building
  10. Integration of 3-tier layered architecture (Zigbee, WLAN, Internet) with above system
  11. Testing of Centralized system with all the technologies integrated & Documentation
NWP
  • Home
  • Salient Features & Deliverables
  • Work Packages
    • WP1 : Engineering of Landslide Disaster Mitigation (ELDM)
    • WP2 : Engineering of Earthquake Disaster Mitigation (EEDM)
    • WP3 : Engineering of Fire Disaster Mitigation (EFDM)
    • WP4: Post Disaster Shelter Planning (PDSP)
    • WP5: Health Monitoring of Buildings using Wireless Sensor Network
    • WP6: Intelligent Building System for Model Residential Unit
  • Tasks
    • Task-1.1 : Landslide Hazard and Risk Assessment of Chamoli-Joshimath region, Garhwal Himalaya
    • Task-1.2 :Early Warning Instrumentation & Decision package for a landslide in Chamoli-Joshimath region of Garhwal Himalaya
    • Task-1.3 : GPS based Integrated Landslide Modelling for hazard assessment
    • Task-1.4 : Landslide Monitoring using InSAR
    • Task-1.5 : Development of Optical fibre based Multiplex Sensor Network System for Landslide Monitoring and Implementation in Northeast region of India
    • Task-1.6 : Comprehensive geo- investigation and control measures for a landslide in Chamoli-Joshimath region of Garhwal Himalaya
    • Task-1.7 : Landslide hazard information system and design of innovative measures for landslide control
    • Task-1.8 : Bio-engineering – A phytoremediation option for the mitigation of landslide and slope stability problems in the hilly regions
    • Task-2.1 : Seismic Microzonation of Srinagar, Uttarakhand
    • Task-2.2: Seismic behaviour of piles under dynamic lateral loading
    • Task-2.3: Seismic resistance of confined masonry constructions under different axial stress
    • Task-3.1: Development of Low Ozone Depletion Potential (0.01-0.5) innovative fire suppression system
    • Task-3.2: Fire performance evaluation of structural elements and rehabilitation measures
    • Task-3.3: Development of fire-resistant coating on structural elements
    • Task-4.1: Design and development of disaster resistant intermediate shelters for Western Himalayan region
    • Task-4.2: Post Disaster Management – Design and Development of Transitory Houses for Disaster Vulnerable Rural Sectors in the North Eastern Region
    • Task-5.1: Development of Fiber Bragg Grating (FBG) Sensors and Interrogator System for Buildings
    • Task-5.2:Development of Wireless Sensors, Interrogator System and technique for wireless link for Buildings
    • Task-5.3:Design & Development of ARM and FPGA Processor and Sensor Placement Optimization
    • Task-5.4:Development of statistical / artificial intelligence (AI) models to quantify the damage state of buildings
    • Task-5.5:Collection & Validation of data using developed sensor, Numerical modeling, Model updation and field implementation for building system
    • Task-6.1:Architectural Planning and Design of a residential unit for integrating Intelligent Building Features
    • Task-6.2:Intelligent HVAC and Lighting controls in response to Ambient Environment
    • Task-6.3:Glass Facade Cleaning Robotic System
    • Task-6.4:Development of instrumentation Interface system for Building Management
    • Task-6.5:Remote control of home appliances using Mobile or Web connectivity
    • Task-6.6:Design and development of a communication, safety & security system
    • Task-6.7:Design & Implementation of Robot for automatic floor cleaner using wireless technologies
    • Task-6.8:Communication Network architecture for intelligent buildings
  • Publications & Patent
  • Project Team
  • Related Links
  • Gallery
  • Contacts/Feedback
CSIR - CBRI, Roorkee
Copyright @ CSIR - Central Building Research Institute
  • Home
  • CBRI Mail
  • Intranet
  • Guest House
  • Medical Facilities
  • Disclaimer
  • RTI
  • Sitemap
Bottom